Introduction

In this episode, we will continue working on the floor joists in the left-hand side of the bathroom and the front bedroom. We will also begin setting up for the stairs by removing a section of the wall. Additionally, we will discuss the need for chipboard flooring, ordering stairs, and consulting with a scaffolder to set up the necessary equipment for the dormer. Lastly, we will start putting the 2x2 on top of the 42 150 rafters and add the king spanning for better airflow.

Setting Up for the Stairs

Before we can proceed with the stairs, we need to remove a section of the wall that was previously shown in the last episode. This will allow us to have enough space to set up the stairs properly. Unfortunately, filming this part might be a bit challenging, as there is limited space to position the camera. However, we will provide updates on our progress.

Ordering Chipboard Flooring

To continue with the project, we need to determine the quantity of chipboard flooring required. We can either source it locally or place an order. This step is crucial to ensure that we have enough materials to move forward. Once the chipboard flooring is ready, we can proceed with the installation.

Chatting with the Scaffolder

Another important aspect of our project is setting up scaffolding all around the house. This will enable us to properly install the dormer. We will have a discussion with the scaffolder to finalize the details and ensure that the scaffolding is in place when we need it.

Scaffolding Out for the Dormer

With the scaffolding in place, we can now begin setting up the dormer. This entails removing the soffit and replacing it with vented soffiting to allow for proper airflow. By creating a continuous airflow system, we can effectively manage the ventilation in the front of the house.

Adding the 2x2 on Top of the Rafters

Before installing the king spanning for improved airflow, we need to place the 2x2 on top of the existing rafters. This step will provide a solid base for the subsequent installation. It is crucial to ensure that the 2x2 is properly aligned to achieve optimal results.

Installing the King Spanning

To enhance ventilation, we will install the king spanning with a 100mm air gap. This will help maintain a consistent airflow throughout the structure. Additionally, we have taken into consideration the need to remove the soffit and replace it with vented soffiting for continuous airflow.

Removing the Soffit and Adding Vented Soffiting

In order to maintain proper airflow, we will remove the soffit and replace it with vented soffiting. This adjustment is necessary to create a continuous airflow system that meets the specified requirements. We want to ensure that there is sufficient air circulation for the overall structure.

Placing the Floor Joists

With the necessary preparations completed, it is now time to focus on placing the floor joists. This step is crucial for providing a sturdy foundation for the upcoming flooring installation. We will be using tongue and groove joists for added stability and durability.

Finishing and Tidying Up

As we progress with the project, we will continue to tidy up the workspace and ensure that everything is organized. This will help create a safer and more efficient working environment. We appreciate Brandon's help in keeping the area clean and organized.

Conclusion

In this episode, we have made significant progress in setting up for the stairs and installing the floor joists. We have also discussed the importance of ordering chipboard flooring, consulting with a scaffolder, and implementing proper ventilation through the use of vented soffiting. Our next steps will include installing the 2x2 on top of the rafters and completing the necessary preparations for the chipboard flooring. Stay tuned for more updates in the upcoming episodes.

Highlights

  • Continuing with the floor joists and setting up for the stairs
  • Ordering chipboard flooring and consulting with a scaffolder
  • Installing the king spanning and improving ventilation through vented soffiting
  • Placing the 2x2 on top of the rafters for added stability
  • Tidying up the workspace for a safer and more efficient working environment

FAQs

Q: How many chipboard floorings do we need? A: The exact quantity of chipboard flooring will depend on the measurements and specifications of the project. It is crucial to accurately calculate the required quantity to ensure sufficient materials are available.

Q: Why is proper ventilation important for the front of the house? A: Proper ventilation allows for the continuous flow of air, preventing moisture buildup and ensuring a healthy living environment. It also helps regulate the temperature inside the house, especially during warmer months.

Q: What is the purpose of the 2x2 placed on top of the rafters? A: The 2x2 provides a solid base for subsequent installations, such as the king spanning. It ensures stability and proper alignment for a sturdy structure.

Q: How will the chipboard flooring be installed? A: The chipboard flooring will be installed securely using appropriate screws. It is essential to follow proper installation techniques to ensure a durable and reliable floor surface.

I am an ordinary seo worker. My job is seo writing. After contacting Proseoai, I became a professional seo user. I learned a lot about seo on Proseoai. And mastered the content of seo link building. Now, I am very confident in handling my seo work. Thanks to Proseoai, I would recommend it to everyone I know. — Jean